Technical Field Services Built Around Your Project
ArcLine Technical Group provides independent testing, inspection, commissioning, compliance, and field-verification services for commercial, industrial, multifamily, and mission-critical facilities throughout Southern California.
Whether you are closing out a new installation, evaluating an existing facility, planning an upgrade, troubleshooting a recurring issue, or completing required testing, we provide clear field documentation and practical findings that help you move forward with confidence.
-
Title 24 Lighting Controls
Shutoff, occupancy, daylight-responsive, demand-responsive, institutional tuning, and outdoor controls. Lighting acceptance service launches after ATT and ATE certification is issued.
Additional Field Acceptance
Fenestration (ENV-02-F), daylighting design PAF (ENV-03-F), parking-garage ventilation (PRC-03-F), elevator lighting/ventilation (PRC-12-F), and compressed-air controls (PRC-01a/b-F).
Scope, applicable forms, test equipment, and an eligible Responsible Person are confirmed before field testing.
-
Infrared Electrical Thermography
Thermal and visual inspection of accessible energized equipment, with operating conditions, observed anomalies, priorities, and follow-up recommendations.
Electrical Condition Assessments
Document visible equipment condition and maintenance concerns to support repair and capital planning.
Electrical Site Surveys
Equipment inventories, nameplate data, photographs, measurements, and existing-condition documentation for contractors and design teams.
Project-specific scope and pricing.
-
EVSE Site Surveys & Commissioning
Existing electrical conditions, charger installation observations, functional verification, communications checks where applicable, and turnover records.
Lighting Controls Testing
Verify sensors, dimming, schedules, zones, and control sequences; document deficiencies and retest after corrections.
Commissioning & Technical Documentation
Functional checklists, witnessed testing, punch lists, contractor coordination, and closeout support.
Testing and documentation scope is agreed before work begins.
Request a Detailed Consultation
Tell us the property location, service needed, equipment or system involved, and target date. We will confirm the scope, access requirements, deliverables, and a project-specific quote.